SPORTENVO · Buyer Verification

Project evidence.
Not just product claims.

Use this page to verify what can be seen publicly, what should be confirmed in a quotation, what can be tied to an actual order and what still requires local project engineering. The purpose is to make commercial padel court procurement easier to audit before production and delivery.

Evidence Framework

What you receive with every SPORTENVO order.

Each order is backed by a written quotation scope, order-specific production records and the technical documents your local engineer needs for approval.

Buyer rule: a website image can show visible activity. It cannot by itself prove steel grade, coating thickness, glass compliance, structural suitability or the specification of your exact order.

Level 01 · Public

Visible Evidence

Factory-floor photos, installation images, completed projects, published product specifications and official SPORTENVO channels.

Level 02 · Quotation

Written Scope

Selected court system, included components, technical specification, exclusions, foundation / roof interfaces, packing and support responsibilities.

Level 03 · Order

Order-Specific Records

Approved drawings, component identification, available inspection photos, packing information and applicable material / component documents tied to the confirmed order.

Level 04 · Site

Local Engineering

Soil, anchors, wind basis, foundations, building interfaces, permits and locally required approvals remain dependent on the real project location.

01 · Manufacturing Evidence

Real production activity behind the project supply.

The photographs below are existing production images used on SPORTENVO. They document visible manufacturing, surface treatment and glass handling rather than CGI presentation.

Use these images to verify visible production activity. For the exact supplied materials or processes, request order-specific specification and documentation.

02 · Material & Specification Evidence

Verify the written specification before judging the product.

SPORTENVO publishes reference values for current systems, but the purchase decision should be based on the model-specific quotation, project site and confirmed component scope.

Read the Good Padel Court Specifications Buyer Checklist →

Glass

12 mm tempered glass reference

12 mm tempered glass is used in specified SPORTENVO commercial court configurations.

  • Check thickness and quantity
  • Check edge / hole processing
  • Match any glass report to the supplied product
  • Confirm packing and replacement plan
Glass buyer guide →
Steel

Q235B and model-specific sections

Steel grade alone is not enough. Section size, wall thickness, connections and corrosion protection must match the selected system and site.

  • Record grade and section sizes
  • Record wall thickness
  • Confirm coating / galvanizing scope
  • Review wind / roof interfaces
Engineering evidence →
Lighting

Commercial LED project scope

200 W IP65 fixtures are available in specified project configurations, while quantity, optics, mounting and electrical scope remain venue-specific.

  • Check fixture model / rating
  • Check mounting position
  • Check photometric requirement
  • Check local electrical works
Lighting buyer guide →
Turf

12 mm reference configurations

Published pile height is only one part of the playing system. Yarn, density, backing, sand, seams and installation influence the final court.

  • Ask for turf datasheet
  • Confirm sand requirement
  • Confirm seam / installation method
  • Plan maintenance
Turf buyer guide →
High Wind

FORCE-HX reference configuration

Anti-Hurricane Padel Court — FORCE-HX Series publishes a 200 × 200 × 6 mm reinforced main-structure reference and a 136.8 MPH design target.

  • Not a universal local approval
  • Check terrain / exposure
  • Check anchors and foundation reactions
  • Use project-specific engineering
High-wind guide →
Foundation

Modular Foundation Base reference

The documented reference includes a 100 × 200 × 3.0 mm main beam and up to 180 mm leveling adjustment.

  • Check ground capacity
  • Check levels and drainage
  • Check court / roof loads
  • Confirm final support layout
Concrete vs modular guide →
03 · Quality Control & Packing

Follow the project from confirmed material scope to export packing.

Quality control is most useful when each checkpoint is tied to the approved project rather than treated as a generic factory promise.

For an actual order, ask which inspection records, photographs, packing records and component checks can be tied to your project number or production batch.

Material confirmation

Confirm steel, glass, turf, lighting, finishes and project-specific options before production.

Fabrication check

Review dimensions, connection points, component consistency and model-specific fabrication requirements.

Surface-treatment check

Confirm the specified corrosion-protection and finishing process for the supplied steel components.

Component matching

Keep court structure, hardware, panels, lighting, turf and accessories tied to the same project package.

Pre-shipment review

Confirm major supplied components, project identification and available inspection evidence before dispatch.

Export packing

Protect glass and structural components, identify packages and prepare packing information for international transport and site handling.

04 · Project Documentation

Ask for documents tied to the actual quotation and order.

A certificate badge, catalogue or marketing statement is not the same as a project document package. Buyers should confirm which documents apply to the quoted configuration and destination.

Document availability varies by product, component and destination. The list below is a procurement checklist, not a claim that every document automatically applies to every project.

01 · Drawings

Technical Drawings

Court dimensions, assembly, anchor / base interface, component positions and roof / foundation interfaces where applicable.

02 · Specification

Written Component Schedule

Model-specific materials and supplied components matched to the commercial quotation rather than a generic catalogue page.

03 · Materials

Material / Component Records

Available steel, glass, lighting or other component records should be matched to the exact supplied item and report scope.

04 · Inspection

QC / Pre-Shipment Evidence

Inspection photographs, records or checklists are most useful when they are identifiable to the actual order or batch.

05 · Packing

Packing & Shipping Information

Packing list, component identification and shipping marks help receiving teams check packages and prepare installation logistics.

06 · Compliance

Applicable Compliance Documents

FIP rules references, CE-related documentation, EN 12150 glass evidence, RoHS lighting information or other reports should only be relied on when their scope matches the quoted product / component.

Verification rule. Before relying on any certificate or test report, confirm the issuer, document number, date, tested product or component, applicable standard and whether the report actually covers the configuration quoted for your project.
Technical procurement

Turn your specification into a document-backed response.

Send a requirement schedule with the model and destination. Ask for each item to be marked standard, optional upgrade, project review required or unavailable, with the actual offered value, deviation and supporting document reference.

01 · Before order

Identify the exact offer.

Record the legal manufacturer, production location, in-house and subcontracted scope, model revision and component suppliers. Request relevant project references and discuss factory-visit availability before arranging travel.

02 · Document register

Confirm scope and issue stage.

For every requested document, record issuer, number, date, revision, covered model or component and language. Distinguish existing documents from records issued after configuration approval, project engineering or production.

03 · Engineering and handover

Agree the project deliverables.

Identify the responsible engineer and agree required calculations, foundation reactions, anchors, lighting calculations, local review and component warranties. Include maintenance instructions, spare-part identification and the after-sales contact.

For competition requirements, distinguish a design statement referencing FIP rules from independent testing or approval of the exact configuration. Verify the issuer and scope of any claimed approval. Local authority requirements should be confirmed with the responsible project professional.

Download a blank technical compliance matrix (CSV) → · Download a blank document register (CSV) →

These are buyer planning templates. Availability and scope of the requested documents are confirmed in the project offer.

Request a technical and commercial review →

05 · Technical Drawings & Site Inputs

The drawing package is where product supply meets the real site.

Commercial projects need more than product dimensions. Court, foundation, roof, drainage, wind exposure, access and local construction responsibilities should be coordinated before site work is fixed.

Use the Padel Court RFQ Checklist →

Buyer provides

Site information

Country / city, court quantity, site dimensions, indoor / outdoor use, existing slab or ground condition, levels, drainage, access and target schedule.

Project review

System interfaces

Selected court model, foundation strategy, roof / weather protection, wind basis, lighting, logistics and installation responsibilities.

Before production

Approved scope

Confirm the technical schedule, relevant drawings, supplied components, exclusions and local work boundaries in writing.

07 · External Verification

Projects you can visit.

SPORTENVO courts operate at commercial venues worldwide. Each project page links to the venue so you can see the facility for yourself.

Open SPORTENVO Media & Project Reference Kit →

Official Venue

PADEL.CNX, Chiang Mai

The official venue website describes four premium panoramic courts for year-round play in Chiang Mai.

Official venue site →
Booking Platform

Playtomic venue listing

Playtomic publicly lists four roofed, double, panoramic courts for PADEL.CNX.

Playtomic listing →
Project Cross-Check

SPORTENVO Chiang Mai case

Four SPORTENVO panoramic court systems supplied for PADEL.CNX, a commercial club in Chiang Mai.

View the project →
Buyer Verification Checklist

Compare suppliers on one written evidence schedule.

Before comparing final price, normalize what each quotation includes and which items can be supported by documents or project references.

Open the manufacturer due-diligence guide →

Exact court system

Official product name, intended application and quoted configuration.

Steel specification

Grade, sections, wall thicknesses, mesh, connections and corrosion protection.

Glass specification

Thickness, quantity, processing, fixing details, documentation and packing.

Turf & lighting

Datasheet, supplied quantities, installation boundary and venue-specific lighting scope.

Foundation / roof interfaces

Clarify design inputs, supplied information and local engineering responsibilities.

Drawings & QC

Confirm which drawings, inspection records and project-specific documents are included.

Packing & delivery

Define export packing, shipping basis, unloading assumptions and package identification.

Installation & warranty

Compare local labor, supplier guidance, handover requirements and component-level warranty terms.

Request Evidence for a Real Project

Send the site first. Then verify the exact supply package.

Share the project location, court quantity, venue type, site dimensions and any foundation, roof or high-wind requirement. The next step is to define which technical and commercial evidence is relevant to the quoted configuration.

SPORTENVO is the public-facing commercial padel court brand. Project-specific documentation and local engineering requirements depend on the actual supplied system, destination and agreed scope.