Buyer Tool · RFQ Checklist

Padel Court RFQ Checklist: Build a Better Quotation Request

Quick Answer: A strong padel court RFQ gives every supplier the same project brief and asks them to quote the same technical and commercial scope. That makes steel, glass, turf, lighting, foundation, roof, packing, freight, installation support, warranty and exclusions easier to compare—and prevents a lower headline price from being mistaken for a more complete offer.

Build Your RFQ ↗ Project Configurator →

Interactive RFQ Builder

Build the project brief before comparing suppliers.

Fill only what you know. “Not Sure” is a valid procurement input—especially for court model, foundation and weather protection. The generated brief is a planning tool and does not submit an enquiry by itself.

Venue Type
Court Quantity
Site Condition
Court Preference
Foundation
Weather Protection
Installation Plan
Quotation Scope

What should a padel court quotation include?

A useful quotation makes the technical specification, project boundary and exclusions visible. It does not rely on one total price and a short product description.

Quotation itemWhat the buyer should confirm
Court modelExact official system name and project configuration.
Steel structureSteel grade, main sections, wall thicknesses and the quoted structural configuration.
Corrosion protectionThe actual surface-treatment / coating system in the quotation.
Tempered glassThickness, processing / standard where applicable, quantity and hardware scope.
Mesh / enclosureMesh specification, panel scope and related hardware.
TurfSpecified turf system and supplied scope.
LightingFixture type, quantity, power / protection specification where quoted, poles / brackets and electrical exclusions.
FoundationConcrete interface, modular base or other foundation scope; identify what remains local.
Roof / weather protectionWhether open air, Electric Tent, fixed roof or retractable roof is included and what structural interfaces remain project-specific.
Technical drawingsWhich drawings and installation information are included.
PackingExport packing, component identification and packing-list process.
FreightAgreed Incoterm / commercial basis, named place or port and included freight leg.
Installation supportRemote guidance, documents, on-site support if separately agreed, and local labor / lifting responsibilities.
WarrantyWritten component-level terms attached to the actual quotation rather than a generic headline number.
ExclusionsLocal civil works, electrical, drainage, permits, local engineering, customs, inland delivery, unloading and any other excluded items.
Buying rule: compare the same scope before comparing price. A lower headline price can reflect a different specification, different delivery boundary or more exclusions.
Supplier Comparison Sheet

Compare evidence and scope—without hiding differences inside one score.

Use the checklist to mark whether each supplier has provided clear, comparable information. A tick is not a quality score; it only shows that the item has been stated or evidenced.

CriteriaSupplier ASupplier BSupplier C
Court model stated
Steel grade / sections / wall thickness
Corrosion protection stated
Glass specification stated
Turf scope stated
Lighting scope stated
Foundation scope stated
Roof scope stated
Technical drawings listed
Packing scope stated
Freight term / named place stated
Installation responsibility stated
Warranty terms attached
Relevant project evidence provided
Exclusions clearly listed
Hidden Scope Check

Ask what is not included before approving the quotation.

Most commercial disputes begin at the boundary between supplied equipment and local project work. Put that boundary in writing before the order.

Importing into the United States? Duties can move the delivered budget more than the court price itself. See US import tariffs and landed cost for padel courts.

Local Works

Civil / drainage / electrical

Clarify concrete, excavation, drainage, local cabling, power distribution, permits and site restoration.

Logistics

Destination and unloading

Clarify customs, duty / tax, port charges, inland transport, unloading equipment, storage and local handling.

Installation

Labor and technical support

Clarify local labor, lifting, tools, remote guidance, technician travel if separately contracted, site safety and acceptance responsibility.

Responsibility Matrix

Court, foundation, roof and local works should not be blended into one vague scope.

Scope areaSupplier-side items to confirmLocal / project-side items to confirm
Court systemConfirmed steel, glass, mesh, turf, lighting, hardware and accessories.Site access, local handling and site-specific approval requirements.
FoundationInterface drawings and modular base only if included in the actual supply.Survey, soil / structural review, concrete or ground preparation, drainage and local approval.
RoofQuoted roof system, project drawings and supplied structural components if included.Local code review, project engineering, permits, interfaces, drainage connection and any local building works.
ShippingExport packing and the freight leg stated in the agreed quotation.Destination customs, duty / tax, inland delivery, unloading and storage unless explicitly included.
InstallationInstallation documents / guidance and any separately contracted support.Local labor, lifting equipment, tools, site safety and local works unless explicitly included.
Use the Rest of the Buyer Path

Move from RFQ into project verification.

The RFQ is the final procurement brief, not the end of due diligence.

Project Brief

SPORTENVO Project Configurator

Carry your RFQ location, site dimensions, court, foundation, weather-protection, installation and timeline inputs into the Project Configurator.

RFQ FAQ

Common buyer questions before requesting quotations.

What should be included in a padel court RFQ?

Include location, venue, court quantity, site dimensions, site condition, court preference, foundation, weather protection, delivery destination, installation plan and available drawings / photos.

What should the quotation include?

Ask for the exact technical specification, project scope, drawings, packing, freight basis, installation support, warranty and explicit exclusions.

How should I compare suppliers?

Use the same RFQ and compare every return line by line before comparing price.

Do I need to know the court model first?

No. Use Not Sure — Recommend a Solution if the site conditions are clearer than the final product choice.

Should foundation and roof be in the RFQ?

Yes if they are part of the project, because the court, foundation and roof interfaces can affect one another.

What exclusions should I check?

Clarify civil works, drainage, electrical, permits, local engineering, customs, inland delivery, unloading, labor, tools and lifting.

How should shipping be compared?

Compare the same trade term and named place or port, then separate freight from destination charges and site handling.

Should I rank suppliers with one score?

A single score can hide important differences. Compare evidence, scope and responsibilities directly instead.

Project Review

Have the RFQ? Continue with the real project conditions.

Use the SPORTENVO Project Configurator to carry the venue, quantity, site, court, foundation and weather-protection direction into the next step.

Continue to Project Configurator ↗